Premier North Builders Solartec Sdn Bhd is a trusted specialist with long-term track records in providing comprehensive steel structures & roofing systems design & build services, and also with skillful expertise in roof leak repair, roof watertight solutions, and industrial building extension works. With a deep understanding of structural integrity and weather resilience, we deliver reliable solutions to protect and enhance commercial, industrial, residential and institutional properties.
Serving Penang, Kedah, Perlis, and Langkawi, we support commercial, industrial, and government sectors-including MNCs, factories, hotels, and public institutions-with high-quality, weather-resistant solutions. With a strong focus on structural integrity and long-term durability, our experienced team uses advanced techniques and premium materials to deliver reliable, costt-effective results.

Our Mission is to be the Best Steel Structural Design & Build, and the Best Metal Roofing Covering Systems Provider in the market, providing specialized custom design & build services, for the Best Cost-Efficient, Energy-Efficient, Save & Safe solutions to our valued customers, deliver with passion, expertise, teamwork through continuous improvement to enhance customers satisfaction.
| No. | Customer | Project Description | Contract Sum | Commencement Date | Completion Date |
|---|---|---|---|---|---|
| 1 | Renesas Semiconductor (Kedah) Sdn Bhd |
Tambahan 1 blok Produksi 3 tkt (Fasa VI) di kilang sodiada di Kulim, Kedah - Main Construction |
RM7,000,000.00 | 15/10/2008 | COMPLETED |
| 2 | Renesas Semiconductor (Kedah) Sdn Bhd |
Extension works to existing factory 33KV TNB Sub-Station, Kedah - Main Construction |
RM1,800,000.00 | 15/04/2009 | COMPLETED |
| 3 | Oriental Unity Sdn Bhd | Cadangan Membina Dan Menyiapkan 32 Unit Rumah Kedai Pejabat 2 Tingkat & 1 unit Pencawang TNB Serta Kerja-kerja Infrastruktur Berkaitan, Pulau Pinang | RM7,700,000.00 | 11/08/2009 | COMPLETED |
| 4 | Takdir Permai Sdn Bhd. (Ang Ah Chin) |
Pembinaan Kompleks Kementerian Dalam Negeri, Langkawi, Kedah - Design & Build Steel Structure and Metal Roofing System |
RM1,500,000.00 | 21/02/2011 | COMPLETED |
| 5 | Edaran Mastika Sdn Bhd |
Perumahan Fasa D di Dacrah Barat Daya, Bayan Lepas, Pulau Pinang - Design & Build Light Weight Roof Truss |
RM690,000.00 | 02/08/2010 | COMPLETED |
| 6 | Juih Yang Metal Industry Sdn Bhd | To dismantle, supply & install of office purlin & roof at Prai factory | RM62,500.00 | 27/04/2010 | COMPLETED |
| 7 | Great Purpose Sdn Bhd |
38 unit Rumah Berkembar 1 tingkat di Mukim Anak Bukit, Kota Setar, Kedah (Phase 2B) - Design & Build Light Weight Roof Truss |
RM195,000.00 | 25/04/2010 | COMPLETED |
| 8 | Great Purpose Sdn Bhd |
114 unit perumahan di Mukim Gajah Mati, Kota Setar, Kedah - Design & Build Light Weight Roof Truss |
RM750,000.00 | 22/04/2010 | COMPLETED |
| 9 | Semua Jadi Sdn Bhd. (OIB) |
24 units Double Storey Shophouse at Kulim, Kedah - Design & Build Light Weight Roof Truss and G.I. Roof Structure & Metal Roofing |
RM160,000.00 | 26/03/2010 | COMPLETED |
| 10 | Bumita Development Sdn Bhd |
Universiti Malaysia Perlis (UniMAP) - Phase 3 - Design & Build Steel Structure and Metal Roofing system |
RM1,400,000.00 | 20/03/2010 | COMPLETED |
| 12 | Viva Lagenda Development Sdn Bhd |
Rumah Teres 3 tingkat (4 unit) di Bandar Air Itam, Penang - Design & Build Light Weight Roof Truss |
RM21,000.00 | 18/11/2009 | COMPLETED |
| 13 | Pujian Sistematik Sdn Bhd |
Cadangan Pembinaan Pusat Pertahanan Awam Negeri Perlis Mk. Seriah, Perlis (JKR) - Design & Build Light Weight Roof Truss and G.I. Roof Structure & Metal Roofing |
RM700,000.00 | 28/09/2009 | COMPLETED |
| 14 | Tis Pembenaan Sdn Bhd |
Rumah Masak Untuk Angkatan Tentera Malaysia, Port Dickson, Negeri Sembilan - Design & Build Light Weight Roof Truss |
RM95,000.00 | 07/07/2009 | COMPLETED |
| 15 | Great Purpose Sdn Bhd |
Siamese Temple in Jitra Kedah - Design & Build Light Weight Roof Truss and G.I. Roof Structure |
RM40,000.00 | 30/06/2009 | COMPLETED |
| 16 | Binascan Engineering Sdn Bhd |
Kampus Tetap UniMAP Fasa 4, PPK Mikroelektronik, Perlis - Design & Build Metal / Light Weight Roof Truss |
RM405,000.00 | 24/06/2009 | COMPLETED |
| 17 | Brilliant Delta (M) Sdn Bhd |
26 units shop-lot at Taman Serai Wangi 2E, Phase Sh 8 & 9, Padang Serai, Kedah - Design & Build Metal / Light Weight Roof Truss |
RM100,000.00 | 22/01/2009 | COMPLETED |
| 18 | Tan Brothers Plumbing & Eng. S/B |
98 units Shop-Lot in Kelantan - Design & Build Metal / Light Weight Roof Truss |
RM350,000.00 | 20/11/2008 | COMPLETED |
| 19 | Bina SSG Sdn Bhd |
4 units of D/S bungalow at Ledang Heights, Mukim Pulai, Bandar Nusajaya, Johor - Design & Build Light Weight Roof Truss |
RM40,000.00 | 10/03/2009 | COMPLETED |
| 20 | Bina SSG Sdn Bhd |
4 units of D/S bungalow at Ledang Heights, Mukim Pulai, Bandar Nusajaya, Johor - Design & Build Light Weight Roof Truss |
RM40,000.00 | 10/03/2009 | COMPLETED |
| 21 | Rong Mah Builders Sdn Bhd |
83 units superlink on Plot PTD72263, Ledang Height East (Phase 1C), Nusajaya, Johor Bahru - Design & Build Light Weight Roof Truss |
RM640,000.00 | 16/06/2008 | COMPLETED |
| 22 | Rong Mah Builders Sdn Bhd | 16 units Semi-D 2 tingkat Jenis A (45' x 90'); 6 units Semi-D 2 tingkat Jenis B (45' x 90') Phase 1B, Mukim Pulai, Nusajaya, Johor Bahru - Design & Build Light Weight Roof Truss | RM180,000.00 | 07/05/2008 | COMPLETED |
| 23 | Rong Mah Builders Sdn Bhd |
10 units Semi-D Type A, 14 units Semi-D Type B at Ledang Height East Phase 1A, Mukim Pulai, Johor Bahru - Design & Build Light Weight Roof Truss |
RM200,000.00 | 07/05/2008 | COMPLETED |
| 24 | Rong Mah Builders Sdn Bhd |
62 units (20' x 70') Perumahan kakitangan kerajaan di PTD20182, Jln. Hulu Air Molek, Johor Bahru - Design & Build Light Weight Roof Truss |
RM250,000.00 | 24/03/2008 | COMPLETED |
| 25 | Sri Awona Sdn Bhd |
Sekim Perumahan di Mukim Keladi, Daerah Kulim, Kedah - Design & Build Metal Roof |
RM100,000.00 | 25/03/2008 | COMPLETED |
| 26 | Sri Awona Sdn Bhd | Cadangan pembangunan 1 unit kompleks membeli-belah & perniagaan 3 tingkat di Plot 1, PT286, Seksyen 44, Bakar Bata, Bandar Kulim, Kedah (Giant) - Design & Build Metal Roof | RM1,900,000.00 | 25/01/2008 | COMPLETED |
| 27 | Builech Project Management Sdn Bhd | Pembangunan tambahan 1 blok 4 tingkat bangunan Makmal, 1 blok 4 tingkat bangunan pentadbiran & 1 blok Dewan Perhimpunan di Sek. Men Keb. Tun Syed Shes Barakbah, Sg. Bakap, SPS (JKR) - Design & Build Light Weight & Metal Roof | RM200,000.00 | 14/12/2007 | COMPLETED |
| 28 | DGE Services Sdn Bhd | Pembinaan 1 blok bangunan tambahan 4 tingkat, sebuah bangunan Pra Sekolah & lain-lain kerja berkaitan di SJK Padang Menora, Seberang Perai Utara (JKR) - Design & Build Light Weight Roof Truss | RM110,000.00 | 23/07/2008 | COMPLETED |
| 29 | Kostegap Construction Sdn Bhd | 1 unit bangunan Akademik di UiTM Cawangan Kedah, Kampus Sungai Petani, Kedah (JKR) | RM180,000.00 | 07/04/2008 | COMPLETED |
| 30 | Hayana Sdn Bhd |
Cadangan Sekim Perumahan untuk Villa Tanjung Permai di Lot 272 & 274, Mukim 13, Batu Kawan SPS (PDC Properties) - Design & Build Light Weight Roof Truss |
RM714,709.10 | 01/11/2007 | COMPLETED |
| 31 | Kostegap Construction Sdn Bhd |
Pembinaan 1 blok bangunan tambahan 4 tingkat di Sek. Men. Teluk Ayer Tawar, SPU (JKR) - Design & Build Light Weight Roof Truss |
RM39,171.33 | 01/12/2007 | COMPLETED |
| 32 | Builech Project Management Sdn Bhd | Pembinaan bangunan tambahan bagi 1 blok 4 tingkat Bangunan Makmal & 1 blok 4 tingkat bangunan Asrama di SMK Seri Balik Pulau, Penang (JKR) - Design & Build Light Weight Roof Truss | RM91,169.21 | 01/01/2008 | COMPLETED |
| 33 | Ambang Miri Sdn Bhd |
Cadangan merekabentuk, membina & menyiapkan Kampus Tetap UniMAP untuk Universiti Malaysia Perlis, Pakej 2 - Fasa 1A1 - Design & Build Light Weight Roof Truss & Metal Roofing |
RM1,628,456.11 | 18/09/2007 | COMPLETED |
| 34 | Hayana Sdn Bhd |
Pembangunan Bercampur Fasa 1A, 123 unit Rumah Teres 2 Tingkat & 8 unit Kedai Pejabat, di Mukim 16, Sungai Dua, S.P.U. (For PERDA) - Main Construction |
RM9,500,000.00 | 01/09/2006 | COMPLETED |
| 35 | Hayana Sdn Bhd |
Pembinaan Kuarters Anggota Kesihatan Daerah Timur Laut, Georgetown, Pulau Pinang - Design & Build Light Weight Roof Truss |
RM64,302.48 | 23/06/2007 | COMPLETED |
| 36 | Cergas Bersatu Sdn Bhd | Cadangan membina & menyiapkan 155 unit Rumah Teres Setingkat & 1 unit Rumah Contoh Fasa 10A, sebahagian Cadangan Pembangunan Fasa 1, Bandar Baru Bertam di atas Lot-lot 2082, 3769 & sebahagian Lot 3850, Mukim 6, Daerah S.P.U., Pulau Pinang (Untuk Tetuan Bertam Properties Sdn Bhd) - Design & Build Light Weight Roof Truss | RM1,036,845.26 | 25/01/2007 | COMPLETED |
| 37 | Sri Indar Management & Builder Sdn Bhd |
Cadangan Sekim Perumahan di atas Lot 1062, MK 6, Jalan Pauh, Kepala Batas, SPU: 1) 6 Unit Rumah Berkembar 2 Tingkat Jenis A; 2) 8 Unit Rumah Berkembar 2 Tingkat Jenis B; 3) 2 Unit Rumah Banglo; 4) 14 Unit Rumah Teres 2 Tingkat – Design & Build Light Weight Roof Truss |
RM233,500.00 | 22/03/2007 | COMPLETED |
| 38 | Sri Indar Management & Builder Sdn. Bhd. |
28 Units of Double Storey Terrace at Kepala Batas, Butterworth – Design & Build Light Weight Roof Truss |
RM126,000.00 | 26/07/2006 | COMPLETED |
| 39 | Pertubuhan Peladang Kawasan E III, MADA Kobah, Kedah | Paddy Straw Warehouse, Kobah, Kedah – Main Construction | RM148,000.00 | 01/08/2006 | COMPLETED |
| 40 | BH Electronics Sdn. Bhd. |
Factory Extension & Re-roofing Works – Main Construction |
RM107,000.00 | 15/08/2006 | COMPLETED |
| 41 | Pertubuhan Peladang Kawasan Seri Jerai, Pusat Khidmat Tani MADA G-IV, Guar Chempedak, Gurun, Kedah |
Pusat Pengumpulan Dan Pemprosesan Mempelam di Ladang Tebu, Pendang – Main Construction |
RM210,000.00 | 21/09/2006 | COMPLETED |
| 42 | Pertubuhan Peladang Kawasan F-IV, MADA Sg. Limau Dalam, Yan, Kedah |
Membina dan Menyiapkan Gudang Jerami Dan Kerja-kerja yang Berkaitan Dengan di PPK F-IV Sungai Limau Dalam, Yan, Kedah – Main Construction |
RM119,000.00 | 08/10/2006 | COMPLETED |
| 43 | Havana Connections Sdn Bhd |
Warehouse upgrading works at Changloon, Perlis – Main Construction |
RM1,500,000.00 | 31/05/2011 | COMPLETED |
| 44 | Great Purpose Sdn Bhd |
76 units D/S Semi-D & 10 units D/S Terrace house at Mukim Langgar, Daerah Kota Setar, Kedah – Design & Build Light Weight Roof Truss |
RM450,000.00 | 16/02/2011 | COMPLETED |
| 45 | Yikei Alliance Sdn Bhd (OIB Group) |
49 units D/S Shop Office at Taman Lembah Impiana III, Kulim, Kedah – Design & Build Light Weight Roof Truss & Metal Roofing |
RM150,000.00 | 09/05/2011 | COMPLETED |
| 46 | Great Purpose Sdn Bhd |
458 Unit Rumah Super-Linked, Fasa 1 – 194 unit, Daerah Kubang Pasu, Kedah – Design & Build Light Weight Roof Truss & Metal Roofing |
RM350,000.00 | 20/12/2011 | COMPLETED |
| 47 | Brilliant Delta (M) Sdn Bhd |
824 units Single Storey Terrace, Mukim Sidam Kanan, Daerah Kulim, Kedah – Design & Build Light Weight Roof Truss & Metal Roofing |
RM2,000,000.00 | 02/02/2012 | COMPLETED |
| 48 | Edaran Mastika Sdn Bhd (Great Purpose Group) |
210 units Housing Skim, Daerah Barat Daya, Jln. Dato Ismail Hashim, Jln. Tun Dr. Awang, Bayan Lepas, Pg. – Design & Build Light Weight Roof Truss |
RM1,500,000.00 | 22/02/2012 | COMPLETED |
| 49 | Bumita Properties Sdn Bhd |
6 storey condominium in Kangar – Design & Build Light Weight Roof Truss & Metal Roofing |
RM250,000.00 | 01/04/2012 | COMPLETED |
| 50 | Oriental Unity Sdn Bhd |
Ibu Pejabat Jabatan Bomba & Penyelamat Malaysia Negeri Pulau Pinang di Batu Kawan, SPS. - Design & Build Light Weight Roof Truss |
RM800,000.00 | 30/07/2012 | COMPLETED |
| 51 | Great Purpose Sdn Bhd |
8 units of Semi-D & 1 Bunglow, Mukim Pengkalan Kundur Daerah Kota Setar, Kedah. - Design & Build Light Weight Roof Truss |
RM52,000.00 | 01/11/2012 | COMPLETED |
| 52 | Ang Ah Chin Construction Sdn Bhd |
Pusat Perubatan 3 tkt. di Bandar Sungai Petani, Kedah. - Design & Build Light Weight Roof Truss & Metal Roofing |
RM300,000.00 | 16/01/2013 | COMPLETED |
| 53 | Edaran Mastika Sdn Bhd |
117 units Housing Skim, Daerah Barat Daya, Jln. Dato Ismail Hashim, Jln Tun Dr. Awang, Bayan Lepas, Penang. - Design & Build Light Weight Roof Truss |
RM800,000.00 | 15/05/2013 | COMPLETED |
| 54 | Boustead Penang Shipyard Sdn. Bhd. | Supply & change of Metal Roofing at Warehouse & Workshop No. 2, Pulau Jerejak, Penang. | RM385,000.00 | 02/08/2013 | COMPLETED |
| 55 | Great Purpose Sdn Bhd |
52 units of Housing Skim, Bandar Jitra, Kubang Pasu. - Design & Build Light Weight Roof Truss & Metal Roofing |
RM800,000.00 | 05/12/2013 | COMPLETED |
| 56 | Great Purpose Sdn Bhd |
23 units of Housing Skim & Shoplot, Pengkalan Kundur, Kota Setar, Kedah. - Design & Build Light Weight Roof Truss |
RM500,000.00 | 05/12/2013 | COMPLETED |
| 57 | Ssangyong Eng. & Const. Co. Ltd. |
Porte Cochere at St. Regis Hotel, Langkawi, Kedah. - Design & Build Steel Structure & Metal Roofing |
RM880,000.00 | 01/09/2014 | COMPLETED |
| 58 | JNP Automotive Sdn. Bhd. |
Bukit Minyak Factory Site Propose 54.296M width Span x 90mm Length Warehouse - Design & Build Steel Structure & Metal Roofing |
RM1,900,000.00 | 09/10/2014 | COMPLETED |
| 59 | Thye Heng Engineering Sdn Bhd |
Extension of Schaeffer Kalk, Kuala Ketil Factory - Design & Build Metal Roofing System |
RM300,000.00 | 06/02/2015 | COMPLETED |
| 60 | Ang Ah Chin Construction Sdn Bhd |
Kerian Hydroelectric Power Project, Perak (Plant 1) - Design & Build Steel Structure & Metal Roofing |
RM700,000.00 | 16/02/2015 | COMPLETED |
| 61 | Ang Ah Chin Construction Sdn Bhd |
Kerian Hydroelectric Power Project, Perak (Plant 2) - Design & Build Steel Structure & Metal Roofing |
RM950,000.00 | 01/06/2016 | COMPLETED |
| 62 | Thye Heng Engineering Sdn Bhd |
Extension of Schaeffer Kalk, Kuala Ketil Factory - Design & Build Steel & Metal Roofing System |
RM1,250,000.00 | 06/03/2017 | COMPLETED |
| 63 | Thye Heng Engineering Sdn Bhd | Extension of Malayan Smelt Tin Corp, Butterworth Factory | RM180,000.00 | 06/07/2017 | COMPLETED |
| 64 | Thye Heng Engineering Sdn Bhd |
Extension of Schaeffer Kalk, Kuala Ketil Factory - Design & Build Metal Roofing System |
RM280,000.00 | 06/09/2017 | COMPLETED |
| 65 | Thye Heng Engineering Sdn Bhd |
Extension of Harimic, Perai Factory - Design & Build Metal Roofing System |
RM150,000.00 | 06/10/2017 | COMPLETED |
| 66 | Thye Heng Engineering Sdn Bhd |
Extension of Malayan Smelt Tin Corp, Butterworth Factory - Design & Build Metal Roofing System |
RM90,000.00 | 01/12/2017 | COMPLETED |
| 67 | DAEWOO Electronics (M) Sdn. Bhd. |
Reroofing works for Sungai Petani Factory – Design & Build Metal Roofing System |
RM136,000.00 | 22/12/2017 | COMPLETED |
| 68 | Kelington Technologies Sdn. Bhd. |
JCT Industries Group Sdn. Bhd., New Factory (Grading A & B), at Pekan Bukit Selambau, Kedah – Design & Build Steel Structure & Metal Roofing System |
RM2,100,000.00 | 07/01/2018 | COMPLETED |
| 69 | Build-Tec Mega Sdn. Bhd. |
Globetronic Factory New Production Plant, Bayan Lepas, Penang – Supply & Install Steel Structure System |
RM1,300,000.00 | 05/12/2018 | COMPLETED |
| 70 | Synergetics Sdn. Bhd. |
TNB Jambatan Ku power plant – Supply & install Steel Structure System |
RM510,000.00 | 26/07/2018 | COMPLETED |
| 71 | Oriental Unity Sdn Bhd |
Ban Chun Factory Extension, Perai, Penang – Design & Build Steel Structure & Metal Roofing System |
RM150,000.00 | 12/08/2018 | COMPLETED |
| 72 | Noah Ark Builders Sdn. Bhd. |
Condominiums & Club House at Meru, Perak – Design & Build Steel Structure & Metal Roofing System |
RM1,200,000.00 | 11/01/2019 | COMPLETED |
| 73 | Ang Ah Chin Construction Sdn Bhd |
Langkawi Project Perumahan Rakyat PPR, Kedah – Design & Build Steel Structure & Metal Roofing |
RM780,000.00 | 10/11/2019 | COMPLETED |
| 74 | Home Capacity Sdn. Bhd. |
CADANGAN MENDIRIKAN 1 UNIT GUDANG 1 TINGKAT DI ATAS LOT 10868, JALAN ROZHAN, MUKIM 15, PERAI, PENANG – Supply, Fabricate & Construct of Steel Structure & Metal Roofing, & Aluminium Glass Panels |
RM1,150,000.00 | 01/10/2020 | COMPLETED |
| 75 | Kelington Technologies Sdn. Bhd. |
KEK New Warehouse and Office Upgrading, Kulim, Kedah – Design & Build Steel Structure & Metal Roofing, Aluminium Composite Panels, Aluminium Partitions & Glass Panels |
RM680,000.00 | 01/12/2020 | COMPLETED |
| 76 | Kelington Technologies Sdn. Bhd. |
Intel PG14, MLCP on Lot 12156 & 12456, Bayan Lepas, Penang – Design & Build Steel Structure & Metal Roofing, Aluminium Composite Panels, Aluminium Partitions & Glass Panels |
RM2,360,000.00 | 01/11/2020 | COMPLETED |
| 77 | Uni-Vessel Engineering (Bworth) Sdn. Bhd. |
Shell Petrol Station at Simpang Ampat, Perai – Supply & Install Steel Structure & Metal Roofing |
RM1,090,000.00 | 12/01/2022 | COMPLETED |
| 78 | Kontena Nasional Berhad |
Kontena Nasional Berhad Warehouse Building at Perai, Penang – Dismantle, Repair Damage Structure, Supply & Install Ventilation Structure, Translucent Roof, Flashings and Gutter |
RM224,618.00 | 23/03/2022 | COMPLETED |
| 79 | SGO Sustainable Alliance (Singapore) |
Architectural Pyramid at LoveYou Tea Farm, Balik Pulau, Penang – Design & Build Steel Structure |
RM125,000.00 | 28/08/2022 | COMPLETED |
| 80 | Solarvest Energy Sdn.Bhd. |
Malaysia Automotive Lighting Sdn Bhd, PMT 722, Persiaran Cassia Selatan 1, Batu Kawan, Penang – Dismantle Translucent Sheets, Supply and Install with Klip-Lok Optima 980 Metal Deck |
RM269,000.00 | 01/10/2022 | COMPLETED |
| 81 | Kontena Nasional Berhad |
Kontena Nasional Berhad Warehouse Building at Perai, Penang – Refurbishment of Existing Multi-Purpose Training Room |
RM90,056.00 | 01/11/2022 | COMPLETED |
| 82 | Kontena Nasional Berhad |
Kontena Nasional Berhad Multi Purpose Building at Perai, Penang – Re-Painting Multi Purpose Building and to Perform Other Repair |
RM56,100.00 | 01/11/2022 | COMPLETED |
| 83 | Waltow Electric Malaysia Sdn. Bhd. |
Waltow Electric Malaysia Sdn. Bhd. Factory Reroofing, Kulim, Kedah – Re-Roofing Works (Retain Jack Roof Steel Structure) |
RM850,000.00 | 05/12/2022 | COMPLETED |
| 84 | Pengurusan PeraI Blok 9 Desa Permata |
Pengurusan Perai Blok 9 Desa Permata, Lintang Paya Terubong 3, Paya Terubong, Air Itam, Penang – Apartment Roof Re-Roofing |
RM1,137,367.98 | 17/04/2023 | COMPLETED |
| 85 | Pinnacle Nexus Sdn Bhd |
Double Tree Resort by Hilton, Batu Ferringhi, Penang – Refurbish of Link Bridge |
RM57,600.00 | 01/08/2023 | COMPLETED |
| 86 | Matthews International Malaysia Sdn Bhd |
Matthews International Malaysia Sdn Bhd, Bukit Minyak, Perai, Penang – Re-Roofing of Existing Factory Metal Roofing System |
RM396,000.00 | 30/11/2023 | COMPLETED |
| 87 | Al Kurma Sdn Bhd |
Al Kurma Sdn Bhd, Juru, Perai, Penang – Design & Build Steel Structure & Metal Roofing |
RM157,600.00 | 09/03/2024 | COMPLETED |
| 88 | Mira Residence Management Office |
Mira Residence Management Office, Tanjung Bungah, Penang – Supply & Install New Gutter – Roof Top |
RM13,452.00 | 01/06/2024 | COMPLETED |
| 89 | Perbadanan Bekalan Air Pulau Pinang Sdn Bhd |
Perbadanan Bekalan Air Pulau Pinang Sdn Bhd – Supply, Deliver and Install 1 Unit of Walkway Bridge At Aqueduct 3V Intake For Maintenance |
RM145,090.00 | 20/02/2024 | COMPLETED |
| 90 | Perbadanan Bekalan Air Pulau Pinang Sdn Bhd |
Perbadanan Bekalan Air Pulau Pinang Sdn Bhd – Refurbishment of Pump House Teluk Bahang Toilets |
RM25,367.00 | 20/02/2024 | COMPLETED |
| 91 | Perbadanan Bekalan Air Pulau Pinang Sdn Bhd |
Perbadanan Bekalan Air Pulau Pinang Sdn Bhd – Rehabilitation of Titi Kerawang Lower Intake, Balik Pulau |
RM172,504.00 | 02/05/2024 | COMPLETED |
| 92 | Uni-Vessel Engineering (Bworth) Sdn. Bhd. |
Shell Petrol Station at Simpang Ampat, Perai (New Phase) – Supply & Install Steel Structure & Metal Roofing |
RM690,000.00 | 09/10/2024 | COMPLETED |
| 93 | Canon Electronics (Malaysia) Sdn Bhd |
Canon Electronics (Malaysia) Sdn Bhd, Juru, Perai, Penang – Factory Re-Roofing Works |
RM159,600.00 | 24/10/2024 | COMPLETED |
| 94 | CBRE WTW Valuation & Advisory Sdn Bhd |
Bangunan KWSP-Peladang, Alor Setar, Kedah – Design & Build Steel Structure & Re-Roofing |
RM126,540.00 | 09/12/2024 | COMPLETED |
| 95 | Coherent Malaysia Sdn Bhd (P2) |
Coherent Malaysia Sdn Bhd (P2), Perai, Penang – Design & Build Steel Structure & Metal Roofing System |
RM178,000.00 | 01/02/2025 | COMPLETED |