| No. | Customer | Project Description | Contract Sum | Commencement Date | Completion Date |
|---|---|---|---|---|---|
| 1 | Renesas Semiconductor (Kedah) Sdn Bhd |
Tambahan 1 blok Produksi 3 tkt (Fasa VI) di kilang sodiada di Kulim, Kedah - Main Construction |
RM7,000,000.00 | 15/10/2008 | COMPLETED |
| 2 | Renesas Semiconductor (Kedah) Sdn Bhd |
Extension works to existing factory 33KV TNB Sub-Station, Kedah - Main Construction |
RM1,800,000.00 | 15/04/2009 | COMPLETED |
| 3 | Oriental Unity Sdn Bhd | Cadangan Membina Dan Menyiapkan 32 Unit Rumah Kedai Pejabat 2 Tingkat & 1 unit Pencawang TNB Serta Kerja-kerja Infrastruktur Berkaitan, Pulau Pinang | RM7,700,000.00 | 11/08/2009 | COMPLETED |
| 4 | Takdir Permai Sdn Bhd. (Ang Ah Chin) |
Pembinaan Kompleks Kementerian Dalam Negeri, Langkawi, Kedah - Design & Build Steel Structure and Metal Roofing System |
RM1,500,000.00 | 21/02/2011 | COMPLETED |
| 5 | Edaran Mastika Sdn Bhd |
Perumahan Fasa D di Dacrah Barat Daya, Bayan Lepas, Pulau Pinang - Design & Build Light Weight Roof Truss |
RM690,000.00 | 02/08/2010 | COMPLETED |
| 6 | Juih Yang Metal Industry Sdn Bhd | To dismantle, supply & install of office purlin & roof at Prai factory | RM62,500.00 | 27/04/2010 | COMPLETED |
| 7 | Great Purpose Sdn Bhd |
38 unit Rumah Berkembar 1 tingkat di Mukim Anak Bukit, Kota Setar, Kedah (Phase 2B) - Design & Build Light Weight Roof Truss |
RM195,000.00 | 25/04/2010 | COMPLETED |
| 8 | Great Purpose Sdn Bhd |
114 unit perumahan di Mukim Gajah Mati, Kota Setar, Kedah - Design & Build Light Weight Roof Truss |
RM750,000.00 | 22/04/2010 | COMPLETED |
| 9 | Semua Jadi Sdn Bhd. (OIB) |
24 units Double Storey Shophouse at Kulim, Kedah - Design & Build Light Weight Roof Truss and G.I. Roof Structure & Metal Roofing |
RM160,000.00 | 26/03/2010 | COMPLETED |
| 10 | Bumita Development Sdn Bhd |
Universiti Malaysia Perlis (UniMAP) - Phase 3 - Design & Build Steel Structure and Metal Roofing system |
RM1,400,000.00 | 20/03/2010 | COMPLETED |
| 12 | Viva Lagenda Development Sdn Bhd |
Rumah Teres 3 tingkat (4 unit) di Bandar Air Itam, Penang - Design & Build Light Weight Roof Truss |
RM21,000.00 | 18/11/2009 | COMPLETED |
| 13 | Pujian Sistematik Sdn Bhd |
Cadangan Pembinaan Pusat Pertahanan Awam Negeri Perlis Mk. Seriah, Perlis (JKR) - Design & Build Light Weight Roof Truss and G.I. Roof Structure & Metal Roofing |
RM700,000.00 | 28/09/2009 | COMPLETED |
| 14 | Tis Pembenaan Sdn Bhd |
Rumah Masak Untuk Angkatan Tentera Malaysia, Port Dickson, Negeri Sembilan - Design & Build Light Weight Roof Truss |
RM95,000.00 | 07/07/2009 | COMPLETED |
| 15 | Great Purpose Sdn Bhd |
Siamese Temple in Jitra Kedah - Design & Build Light Weight Roof Truss and G.I. Roof Structure |
RM40,000.00 | 30/06/2009 | COMPLETED |
| 16 | Binascan Engineering Sdn Bhd |
Kampus Tetap UniMAP Fasa 4, PPK Mikroelektronik, Perlis - Design & Build Metal / Light Weight Roof Truss |
RM405,000.00 | 24/06/2009 | COMPLETED |
| 17 | Brilliant Delta (M) Sdn Bhd |
26 units shop-lot at Taman Serai Wangi 2E, Phase Sh 8 & 9, Padang Serai, Kedah - Design & Build Metal / Light Weight Roof Truss |
RM100,000.00 | 22/01/2009 | COMPLETED |
| 18 | Tan Brothers Plumbing & Eng. S/B |
98 units Shop-Lot in Kelantan - Design & Build Metal / Light Weight Roof Truss |
RM350,000.00 | 20/11/2008 | COMPLETED |
| 19 | Bina SSG Sdn Bhd |
4 units of D/S bungalow at Ledang Heights, Mukim Pulai, Bandar Nusajaya, Johor - Design & Build Light Weight Roof Truss |
RM40,000.00 | 10/03/2009 | COMPLETED |
| 20 | Bina SSG Sdn Bhd |
4 units of D/S bungalow at Ledang Heights, Mukim Pulai, Bandar Nusajaya, Johor - Design & Build Light Weight Roof Truss |
RM40,000.00 | 10/03/2009 | COMPLETED |
| 21 | Rong Mah Builders Sdn Bhd |
83 units superlink on Plot PTD72263, Ledang Height East (Phase 1C), Nusajaya, Johor Bahru - Design & Build Light Weight Roof Truss |
RM640,000.00 | 16/06/2008 | COMPLETED |
| 22 | Rong Mah Builders Sdn Bhd | 16 units Semi-D 2 tingkat Jenis A (45' x 90'); 6 units Semi-D 2 tingkat Jenis B (45' x 90') Phase 1B, Mukim Pulai, Nusajaya, Johor Bahru - Design & Build Light Weight Roof Truss | RM180,000.00 | 07/05/2008 | COMPLETED |
| 23 | Rong Mah Builders Sdn Bhd |
10 units Semi-D Type A, 14 units Semi-D Type B at Ledang Height East Phase 1A, Mukim Pulai, Johor Bahru - Design & Build Light Weight Roof Truss |
RM200,000.00 | 07/05/2008 | COMPLETED |
| 24 | Rong Mah Builders Sdn Bhd |
62 units (20' x 70') Perumahan kakitangan kerajaan di PTD20182, Jln. Hulu Air Molek, Johor Bahru - Design & Build Light Weight Roof Truss |
RM250,000.00 | 24/03/2008 | COMPLETED |
| 25 | Sri Awona Sdn Bhd |
Sekim Perumahan di Mukim Keladi, Daerah Kulim, Kedah - Design & Build Metal Roof |
RM100,000.00 | 25/03/2008 | COMPLETED |
| 26 | Sri Awona Sdn Bhd | Cadangan pembangunan 1 unit kompleks membeli-belah & perniagaan 3 tingkat di Plot 1, PT286, Seksyen 44, Bakar Bata, Bandar Kulim, Kedah (Giant) - Design & Build Metal Roof | RM1,900,000.00 | 25/01/2008 | COMPLETED |
| 27 | Builech Project Management Sdn Bhd | Pembangunan tambahan 1 blok 4 tingkat bangunan Makmal, 1 blok 4 tingkat bangunan pentadbiran & 1 blok Dewan Perhimpunan di Sek. Men Keb. Tun Syed Shes Barakbah, Sg. Bakap, SPS (JKR) - Design & Build Light Weight & Metal Roof | RM200,000.00 | 14/12/2007 | COMPLETED |
| 28 | DGE Services Sdn Bhd | Pembinaan 1 blok bangunan tambahan 4 tingkat, sebuah bangunan Pra Sekolah & lain-lain kerja berkaitan di SJK Padang Menora, Seberang Perai Utara (JKR) - Design & Build Light Weight Roof Truss | RM110,000.00 | 23/07/2008 | COMPLETED |
| 29 | Kostegap Construction Sdn Bhd | 1 unit bangunan Akademik di UiTM Cawangan Kedah, Kampus Sungai Petani, Kedah (JKR) | RM180,000.00 | 07/04/2008 | COMPLETED |
| 30 | Hayana Sdn Bhd |
Cadangan Sekim Perumahan untuk Villa Tanjung Permai di Lot 272 & 274, Mukim 13, Batu Kawan SPS (PDC Properties) - Design & Build Light Weight Roof Truss |
RM714,709.10 | 01/11/2007 | COMPLETED |
| 31 | Kostegap Construction Sdn Bhd |
Pembinaan 1 blok bangunan tambahan 4 tingkat di Sek. Men. Teluk Ayer Tawar, SPU (JKR) - Design & Build Light Weight Roof Truss |
RM39,171.33 | 01/12/2007 | COMPLETED |
| 32 | Builech Project Management Sdn Bhd | Pembinaan bangunan tambahan bagi 1 blok 4 tingkat Bangunan Makmal & 1 blok 4 tingkat bangunan Asrama di SMK Seri Balik Pulau, Penang (JKR) - Design & Build Light Weight Roof Truss | RM91,169.21 | 01/01/2008 | COMPLETED |
| 33 | Ambang Miri Sdn Bhd |
Cadangan merekabentuk, membina & menyiapkan Kampus Tetap UniMAP untuk Universiti Malaysia Perlis, Pakej 2 - Fasa 1A1 - Design & Build Light Weight Roof Truss & Metal Roofing |
RM1,628,456.11 | 18/09/2007 | COMPLETED |
| 34 | Hayana Sdn Bhd |
Pembangunan Bercampur Fasa 1A, 123 unit Rumah Teres 2 Tingkat & 8 unit Kedai Pejabat, di Mukim 16, Sungai Dua, S.P.U. (For PERDA) - Main Construction |
RM9,500,000.00 | 01/09/2006 | COMPLETED |
| 35 | Hayana Sdn Bhd |
Pembinaan Kuarters Anggota Kesihatan Daerah Timur Laut, Georgetown, Pulau Pinang - Design & Build Light Weight Roof Truss |
RM64,302.48 | 23/06/2007 | COMPLETED |
| 36 | Cergas Bersatu Sdn Bhd | Cadangan membina & menyiapkan 155 unit Rumah Teres Setingkat & 1 unit Rumah Contoh Fasa 10A, sebahagian Cadangan Pembangunan Fasa 1, Bandar Baru Bertam di atas Lot-lot 2082, 3769 & sebahagian Lot 3850, Mukim 6, Daerah S.P.U., Pulau Pinang (Untuk Tetuan Bertam Properties Sdn Bhd) - Design & Build Light Weight Roof Truss | RM1,036,845.26 | 25/01/2007 | COMPLETED |
| 37 | Sri Indar Management & Builder Sdn Bhd |
Cadangan Sekim Perumahan di atas Lot 1062, MK 6, Jalan Pauh, Kepala Batas, SPU: 1) 6 Unit Rumah Berkembar 2 Tingkat Jenis A; 2) 8 Unit Rumah Berkembar 2 Tingkat Jenis B; 3) 2 Unit Rumah Banglo; 4) 14 Unit Rumah Teres 2 Tingkat – Design & Build Light Weight Roof Truss |
RM233,500.00 | 22/03/2007 | COMPLETED |
| 38 | Sri Indar Management & Builder Sdn. Bhd. |
28 Units of Double Storey Terrace at Kepala Batas, Butterworth – Design & Build Light Weight Roof Truss |
RM126,000.00 | 26/07/2006 | COMPLETED |
| 39 | Pertubuhan Peladang Kawasan E III, MADA Kobah, Kedah | Paddy Straw Warehouse, Kobah, Kedah – Main Construction | RM148,000.00 | 01/08/2006 | COMPLETED |
| 40 | BH Electronics Sdn. Bhd. |
Factory Extension & Re-roofing Works – Main Construction |
RM107,000.00 | 15/08/2006 | COMPLETED |
| 41 | Pertubuhan Peladang Kawasan Seri Jerai, Pusat Khidmat Tani MADA G-IV, Guar Chempedak, Gurun, Kedah |
Pusat Pengumpulan Dan Pemprosesan Mempelam di Ladang Tebu, Pendang – Main Construction |
RM210,000.00 | 21/09/2006 | COMPLETED |
| 42 | Pertubuhan Peladang Kawasan F-IV, MADA Sg. Limau Dalam, Yan, Kedah |
Membina dan Menyiapkan Gudang Jerami Dan Kerja-kerja yang Berkaitan Dengan di PPK F-IV Sungai Limau Dalam, Yan, Kedah – Main Construction |
RM119,000.00 | 08/10/2006 | COMPLETED |
| 43 | Havana Connections Sdn Bhd |
Warehouse upgrading works at Changloon, Perlis – Main Construction |
RM1,500,000.00 | 31/05/2011 | COMPLETED |
| 44 | Great Purpose Sdn Bhd |
76 units D/S Semi-D & 10 units D/S Terrace house at Mukim Langgar, Daerah Kota Setar, Kedah – Design & Build Light Weight Roof Truss |
RM450,000.00 | 16/02/2011 | COMPLETED |
| 45 | Yikei Alliance Sdn Bhd (OIB Group) |
49 units D/S Shop Office at Taman Lembah Impiana III, Kulim, Kedah – Design & Build Light Weight Roof Truss & Metal Roofing |
RM150,000.00 | 09/05/2011 | COMPLETED |
| 46 | Great Purpose Sdn Bhd |
458 Unit Rumah Super-Linked, Fasa 1 – 194 unit, Daerah Kubang Pasu, Kedah – Design & Build Light Weight Roof Truss & Metal Roofing |
RM350,000.00 | 20/12/2011 | COMPLETED |
| 47 | Brilliant Delta (M) Sdn Bhd |
824 units Single Storey Terrace, Mukim Sidam Kanan, Daerah Kulim, Kedah – Design & Build Light Weight Roof Truss & Metal Roofing |
RM2,000,000.00 | 02/02/2012 | COMPLETED |
| 48 | Edaran Mastika Sdn Bhd (Great Purpose Group) |
210 units Housing Skim, Daerah Barat Daya, Jln. Dato Ismail Hashim, Jln. Tun Dr. Awang, Bayan Lepas, Pg. – Design & Build Light Weight Roof Truss |
RM1,500,000.00 | 22/02/2012 | COMPLETED |
| 49 | Bumita Properties Sdn Bhd |
6 storey condominium in Kangar – Design & Build Light Weight Roof Truss & Metal Roofing |
RM250,000.00 | 01/04/2012 | COMPLETED |
| 50 | Oriental Unity Sdn Bhd |
Ibu Pejabat Jabatan Bomba & Penyelamat Malaysia Negeri Pulau Pinang di Batu Kawan, SPS. - Design & Build Light Weight Roof Truss |
RM800,000.00 | 30/07/2012 | COMPLETED |
| 51 | Great Purpose Sdn Bhd |
8 units of Semi-D & 1 Bunglow, Mukim Pengkalan Kundur Daerah Kota Setar, Kedah. - Design & Build Light Weight Roof Truss |
RM52,000.00 | 01/11/2012 | COMPLETED |
| 52 | Ang Ah Chin Construction Sdn Bhd |
Pusat Perubatan 3 tkt. di Bandar Sungai Petani, Kedah. - Design & Build Light Weight Roof Truss & Metal Roofing |
RM300,000.00 | 16/01/2013 | COMPLETED |
| 53 | Edaran Mastika Sdn Bhd |
117 units Housing Skim, Daerah Barat Daya, Jln. Dato Ismail Hashim, Jln Tun Dr. Awang, Bayan Lepas, Penang. - Design & Build Light Weight Roof Truss |
RM800,000.00 | 15/05/2013 | COMPLETED |
| 54 | Boustead Penang Shipyard Sdn. Bhd. | Supply & change of Metal Roofing at Warehouse & Workshop No. 2, Pulau Jerejak, Penang. | RM385,000.00 | 02/08/2013 | COMPLETED |
| 55 | Great Purpose Sdn Bhd |
52 units of Housing Skim, Bandar Jitra, Kubang Pasu. - Design & Build Light Weight Roof Truss & Metal Roofing |
RM800,000.00 | 05/12/2013 | COMPLETED |
| 56 | Great Purpose Sdn Bhd |
23 units of Housing Skim & Shoplot, Pengkalan Kundur, Kota Setar, Kedah. - Design & Build Light Weight Roof Truss |
RM500,000.00 | 05/12/2013 | COMPLETED |
| 57 | Ssangyong Eng. & Const. Co. Ltd. |
Porte Cochere at St. Regis Hotel, Langkawi, Kedah. - Design & Build Steel Structure & Metal Roofing |
RM880,000.00 | 01/09/2014 | COMPLETED |
| 58 | JNP Automotive Sdn. Bhd. |
Bukit Minyak Factory Site Propose 54.296M width Span x 90mm Length Warehouse - Design & Build Steel Structure & Metal Roofing |
RM1,900,000.00 | 09/10/2014 | COMPLETED |
| 59 | Thye Heng Engineering Sdn Bhd |
Extension of Schaeffer Kalk, Kuala Ketil Factory - Design & Build Metal Roofing System |
RM300,000.00 | 06/02/2015 | COMPLETED |
| 60 | Ang Ah Chin Construction Sdn Bhd |
Kerian Hydroelectric Power Project, Perak (Plant 1) - Design & Build Steel Structure & Metal Roofing |
RM700,000.00 | 16/02/2015 | COMPLETED |
| 61 | Ang Ah Chin Construction Sdn Bhd |
Kerian Hydroelectric Power Project, Perak (Plant 2) - Design & Build Steel Structure & Metal Roofing |
RM950,000.00 | 01/06/2016 | COMPLETED |
| 62 | Thye Heng Engineering Sdn Bhd |
Extension of Schaeffer Kalk, Kuala Ketil Factory - Design & Build Steel & Metal Roofing System |
RM1,250,000.00 | 06/03/2017 | COMPLETED |
| 63 | Thye Heng Engineering Sdn Bhd | Extension of Malayan Smelt Tin Corp, Butterworth Factory | RM180,000.00 | 06/07/2017 | COMPLETED |
| 64 | Thye Heng Engineering Sdn Bhd |
Extension of Schaeffer Kalk, Kuala Ketil Factory - Design & Build Metal Roofing System |
RM280,000.00 | 06/09/2017 | COMPLETED |
| 65 | Thye Heng Engineering Sdn Bhd |
Extension of Harimic, Perai Factory - Design & Build Metal Roofing System |
RM150,000.00 | 06/10/2017 | COMPLETED |
| 66 | Thye Heng Engineering Sdn Bhd |
Extension of Malayan Smelt Tin Corp, Butterworth Factory - Design & Build Metal Roofing System |
RM90,000.00 | 01/12/2017 | COMPLETED |
| 67 | DAEWOO Electronics (M) Sdn. Bhd. |
Reroofing works for Sungai Petani Factory – Design & Build Metal Roofing System |
RM136,000.00 | 22/12/2017 | COMPLETED |
| 68 | Kelington Technologies Sdn. Bhd. |
JCT Industries Group Sdn. Bhd., New Factory (Grading A & B), at Pekan Bukit Selambau, Kedah – Design & Build Steel Structure & Metal Roofing System |
RM2,100,000.00 | 07/01/2018 | COMPLETED |
| 69 | Build-Tec Mega Sdn. Bhd. |
Globetronic Factory New Production Plant, Bayan Lepas, Penang – Supply & Install Steel Structure System |
RM1,300,000.00 | 05/12/2018 | COMPLETED |
| 70 | Synergetics Sdn. Bhd. |
TNB Jambatan Ku power plant – Supply & install Steel Structure System |
RM510,000.00 | 26/07/2018 | COMPLETED |
| 71 | Oriental Unity Sdn Bhd |
Ban Chun Factory Extension, Perai, Penang – Design & Build Steel Structure & Metal Roofing System |
RM150,000.00 | 12/08/2018 | COMPLETED |
| 72 | Noah Ark Builders Sdn. Bhd. |
Condominiums & Club House at Meru, Perak – Design & Build Steel Structure & Metal Roofing System |
RM1,200,000.00 | 11/01/2019 | COMPLETED |
| 73 | Ang Ah Chin Construction Sdn Bhd |
Langkawi Project Perumahan Rakyat PPR, Kedah – Design & Build Steel Structure & Metal Roofing |
RM780,000.00 | 10/11/2019 | COMPLETED |
| 74 | Home Capacity Sdn. Bhd. |
CADANGAN MENDIRIKAN 1 UNIT GUDANG 1 TINGKAT DI ATAS LOT 10868, JALAN ROZHAN, MUKIM 15, PERAI, PENANG – Supply, Fabricate & Construct of Steel Structure & Metal Roofing, & Aluminium Glass Panels |
RM1,150,000.00 | 01/10/2020 | COMPLETED |
| 75 | Kelington Technologies Sdn. Bhd. |
KEK New Warehouse and Office Upgrading, Kulim, Kedah – Design & Build Steel Structure & Metal Roofing, Aluminium Composite Panels, Aluminium Partitions & Glass Panels |
RM680,000.00 | 01/12/2020 | COMPLETED |
| 76 | Kelington Technologies Sdn. Bhd. |
Intel PG14, MLCP on Lot 12156 & 12456, Bayan Lepas, Penang – Design & Build Steel Structure & Metal Roofing, Aluminium Composite Panels, Aluminium Partitions & Glass Panels |
RM2,360,000.00 | 01/11/2020 | COMPLETED |
| 77 | Uni-Vessel Engineering (Bworth) Sdn. Bhd. |
Shell Petrol Station at Simpang Ampat, Perai – Supply & Install Steel Structure & Metal Roofing |
RM1,090,000.00 | 12/01/2022 | COMPLETED |
| 78 | Kontena Nasional Berhad |
Kontena Nasional Berhad Warehouse Building at Perai, Penang – Dismantle, Repair Damage Structure, Supply & Install Ventilation Structure, Translucent Roof, Flashings and Gutter |
RM224,618.00 | 23/03/2022 | COMPLETED |
| 79 | SGO Sustainable Alliance (Singapore) |
Architectural Pyramid at LoveYou Tea Farm, Balik Pulau, Penang – Design & Build Steel Structure |
RM125,000.00 | 28/08/2022 | COMPLETED |
| 80 | Solarvest Energy Sdn.Bhd. |
Malaysia Automotive Lighting Sdn Bhd, PMT 722, Persiaran Cassia Selatan 1, Batu Kawan, Penang – Dismantle Translucent Sheets, Supply and Install with Klip-Lok Optima 980 Metal Deck |
RM269,000.00 | 01/10/2022 | COMPLETED |
| 81 | Kontena Nasional Berhad |
Kontena Nasional Berhad Warehouse Building at Perai, Penang – Refurbishment of Existing Multi-Purpose Training Room |
RM90,056.00 | 01/11/2022 | COMPLETED |
| 82 | Kontena Nasional Berhad |
Kontena Nasional Berhad Multi Purpose Building at Perai, Penang – Re-Painting Multi Purpose Building and to Perform Other Repair |
RM56,100.00 | 01/11/2022 | COMPLETED |
| 83 | Waltow Electric Malaysia Sdn. Bhd. |
Waltow Electric Malaysia Sdn. Bhd. Factory Reroofing, Kulim, Kedah – Re-Roofing Works (Retain Jack Roof Steel Structure) |
RM850,000.00 | 05/12/2022 | COMPLETED |
| 84 | Pengurusan PeraI Blok 9 Desa Permata |
Pengurusan Perai Blok 9 Desa Permata, Lintang Paya Terubong 3, Paya Terubong, Air Itam, Penang – Apartment Roof Re-Roofing |
RM1,137,367.98 | 17/04/2023 | COMPLETED |
| 85 | Pinnacle Nexus Sdn Bhd |
Double Tree Resort by Hilton, Batu Ferringhi, Penang – Refurbish of Link Bridge |
RM57,600.00 | 01/08/2023 | COMPLETED |
| 86 | Matthews International Malaysia Sdn Bhd |
Matthews International Malaysia Sdn Bhd, Bukit Minyak, Perai, Penang – Re-Roofing of Existing Factory Metal Roofing System |
RM396,000.00 | 30/11/2023 | COMPLETED |
| 87 | Al Kurma Sdn Bhd |
Al Kurma Sdn Bhd, Juru, Perai, Penang – Design & Build Steel Structure & Metal Roofing |
RM157,600.00 | 09/03/2024 | COMPLETED |
| 88 | Mira Residence Management Office |
Mira Residence Management Office, Tanjung Bungah, Penang – Supply & Install New Gutter – Roof Top |
RM13,452.00 | 01/06/2024 | COMPLETED |
| 89 | Perbadanan Bekalan Air Pulau Pinang Sdn Bhd |
Perbadanan Bekalan Air Pulau Pinang Sdn Bhd – Supply, Deliver and Install 1 Unit of Walkway Bridge At Aqueduct 3V Intake For Maintenance |
RM145,090.00 | 20/02/2024 | COMPLETED |
| 90 | Perbadanan Bekalan Air Pulau Pinang Sdn Bhd |
Perbadanan Bekalan Air Pulau Pinang Sdn Bhd – Refurbishment of Pump House Teluk Bahang Toilets |
RM25,367.00 | 20/02/2024 | COMPLETED |
| 91 | Perbadanan Bekalan Air Pulau Pinang Sdn Bhd |
Perbadanan Bekalan Air Pulau Pinang Sdn Bhd – Rehabilitation of Titi Kerawang Lower Intake, Balik Pulau |
RM172,504.00 | 02/05/2024 | COMPLETED |
| 92 | Uni-Vessel Engineering (Bworth) Sdn. Bhd. |
Shell Petrol Station at Simpang Ampat, Perai (New Phase) – Supply & Install Steel Structure & Metal Roofing |
RM690,000.00 | 09/10/2024 | COMPLETED |
| 93 | Canon Electronics (Malaysia) Sdn Bhd |
Canon Electronics (Malaysia) Sdn Bhd, Juru, Perai, Penang – Factory Re-Roofing Works |
RM159,600.00 | 24/10/2024 | COMPLETED |
| 94 | CBRE WTW Valuation & Advisory Sdn Bhd |
Bangunan KWSP-Peladang, Alor Setar, Kedah – Design & Build Steel Structure & Re-Roofing |
RM126,540.00 | 09/12/2024 | COMPLETED |
| 95 | Coherent Malaysia Sdn Bhd (P2) |
Coherent Malaysia Sdn Bhd (P2), Perai, Penang – Design & Build Steel Structure & Metal Roofing System |
RM178,000.00 | 01/02/2025 | COMPLETED |